Seat Belt PretensionerSeat Belt Pretensioner (BPT) Description and Operation Description The Seat Belt Pretensioners (BPT) are installed inside Center Pillar (LH & RH)...
C..
Inspection 1. Connect the GDS on the Data Link Connector (DLC). 2. Measure the output voltage of the RPS at idle and various engine speed. ConditionOutput Voltage (V)Idle Approx. 1.21,500 rpm2.2 ~ 2.56,300 rpm Approx. 3.0 Removal 1...