| Inspection |
| 1. |
Turn the ignition switch OFF. |
| 2. |
Disconnect the OCV connector. |
| 3. |
Measure resistance between the OCV terminals 1 and 2. |
| 4. |
Check that the resistance is within the specification.
|
| Removal |
| 1. |
Turn the ignition switch OFF and disconnect the battery negative (-) cable. |
| 2. |
Disconnect the CVVT oil control valve connector (A). |
| 3. |
Remove the installation bolt (B), and then remove the valve from the engine.
[Bank 1 / Intake]
[Bank 1 / Exhaust]
|
| Installation |
|
|
| 1. |
Install in the reverse order of removal.
|
Electric WGT Control Actuator Description and OperationDesrcription The Electric WGT Control Actuator is installed on the turbocharger.It operates the vain in the Waste Gate Turbocharger (WGT) and regulates the compressed air amount by the ECM's PWM signal...
Components 1. Rear door inside handle cap2. Rear door pull cap3. Rear door trim4. Rear door module5. Rear door belt inside weatherstrip6. Rear door panel7. Rear door belt outside weatherstrip8. Rear door frame garnish9. Rear door delta inner cover 10...
Special Service Tools Tool (Number and name)IllustrationUse09373-27000Alternator pulley remover wrenchRemoval and installation of alternator pulley 09964-C1100SCC reflectorReflector to align the SCC radar09964-C1200Calibration beamLaser to detect the center of the vehicle...