| Inspection |
| 1. |
Turn ignition switch OFF and disconnect the negative (-) battery cable. |
| 2. |
Remove the fuse box cover. |
| 3. |
Remove the starter relay (A).
|
| 4. |
Using an ohmmeter, check that there is continuity between each terminal.
|
| 5. |
Apply 12V to terminal 85 and ground to terminal 86.
Check for continuity between terminals 30 and 87.
|
| 6. |
If there is no continuity, replace the starter relay. |
| 7. |
Install the starter relay. |
| 8. |
Install the fuse box cover. |
Starter Repair proceduresRemoval 1. Disconnect the battery negative terminal. 2. Remove the battery tray. (Refer to Engine Electrical System - "Battery") 3. Remove the air duct and air cleaner assembly...
Description Auto Cut System Of Dark Current AbbreviationExpalnationACUAirbag Control UnitADMAssist Door ModuleB_CANBody Controller Area NetworkBCMBody Control ModuleBSDBlind Spot DetectionC_CANChassis Controller Area NetworkCLUCluster ModuleDATCDual Automatic Temp ControlDDMDriver Door ModuleESCElectronic Stability ProgramEMSEngine Management SystemLDWSLane Departure Warning SystemM_CANMulti media Controller Area NetworkMDPSMotor Driven Power SteeringP_CANPowertrain Controller Area NetworkPSMPower Seat ModuleSASSteering Angle SensorSJBSmart Junction BlockSMKSmart Key UnitSPASSmart Parking Assist SystemTCUTransmission Control UnitTPMSTire Pressure Monitoring SystemVDCVehicle Dynamic ControlTMUTelematics SystemABSAnti-lock Brake SystemSCCSmart Cruise Control Smart Junction Block (SJB) General function : Interior Junction Block + some functions of BCM It controls loads with CAN communication and IPS...
C..