| Inspection |
| 1. |
Turn the ignition switch OFF. |
| 2. |
Disconnect the HO2S connector. |
| 3. |
Measure resistance between the HO2S terminals 2 and 5 [B1/S1]. |
| 4. |
Measure resistance between the HO2S terminals 3 and 4 [B1/S2]. |
| 5. |
Check that the resistance is within the specification.
|
| Removal |
| [Bank 1 / Sensor 1] |
| 1. |
Turn the ignition switch OFF and disconnect the battery negative (-) cable. |
| 2. |
Disconnect the connector (A), and then remove the sensor (B).
|
| [Bank 1 / Sensor 2] |
| 1. |
Turn the ignition switch OFF and disconnect the battery negative (-) cable. |
| 2. |
Disconnect the connector (A), and then remove the sensor (B).
|
| Installation |
|
|
| 1. |
Install in the reverse order of removal.
|
Rail Pressure Sensor (RPS) Description and OperationDescription Rail Pressure Sensor (RPS) is installed on the delivery pipe and measures the instantaneous fuel pressure in the delivery pipe. The sensing element (Semiconductor element) built in the sensor converts the pressure to voltage signal...
Specification Ignition System Ignition Coil ItemSpecification Primary Coil Resistance (?)0.56 ± 10% [20°C (68°F)]Secondary Coil Resistance (k?)2.0 ± 15% [20°C (68°F)] Spark Plug ItemSpecificationTypeSILZKR7E8GGap0.7 ~ 0.8 mm (0...
C..