| Removal and Installation |
| 1. |
Remove the water temperature control assembly.
(Refer to Colling System - "Water Temperature Control Assembly") |
| 2. |
Remove the water pipe (A).
|
| 3. |
Install in the reverse order of removal. |
Hub nut tightening sequence Tighten the hub nuts as follows. Tightening torque: 88.3 ~ 107.9N.m (9.0 ~ 11.0kgf.m, 65.1 ~ 79.6lb-ft) When using an impact gun, final tightening torque should be checked using a torque wrench...
Inspection 1. Turn the ignition switch OFF. 2. Disconnect the OCV connector. 3. Measure resistance between the OCV terminals 1 and 2. 4. Check that the resistance is within the specification. Specification: Refer to “Specification” Removal 1...