| Removal |
| 1. |
Disconnect the negative(-) battery terminal. |
| 2. |
Remove the center facia panel.
(Refer to Heating, Ventilation and Air Conditioning - "Controller") |
| 3. |
Remove the start/stop button (A) after loosening the screw (3EA).
|
| Installation |
| 1. |
Install the start/stop button. |
| 2. |
Install the center facia panel. |
| 3. |
Connect the negative (-) battery terminal. |
Inspection 1. Connect the GDS on the Data Link Connector (DLC). 2. Measure the output voltage of the RPS at idle and various engine speed. ConditionOutput Voltage (V)Idle Approx. 1.21,500 rpm2.2 ~ 2.56,300 rpm Approx. 3.0 Removal 1...
Inspection 1. Turn the ignition switch OFF. 2. Disconnect the CCV connector. 3. Measure resistance between the CCV terminal 1 and 2. 4. Check that the resistance is within the specification. Specification: Refer to "Specification" 5...