| Inspection |
| 1. |
Turn the ignition switch OFF and disconnect the battery negative (-) cable. |
| 2. |
Disconnect the fuel pressure regulator valve connector. |
| 3. |
Measure resistance between the fuel pressure regulator valve terminals 1 and 2. |
| 4. |
Check that the resistance is within the specification.
|
Canister Close Valve (CCV) Description and OperationDescription Canister Close Valve (CCV) is installed on the canister ventilation line. It seals evaporative emission control system by shutting the canister from the atmosphere when leakage detecting system operates...
Removal 1. Remove the bumper. (Refer to Body - "Front Bumper") 2. Disconnect the smart cruise control unit connector. 3. Remove the smart cruise control unit assembly (A) from vehicle after loosening mounting bolts. Installation 1...
Inspection 1. Connect a GDS on the Data Link Connector (DLC). 2. Measure the output voltage of the BPS at idle and IG ON. Specification: Refer to "Specification" Removal 1. Turn the ignition switch OFF and disconnect the battery negative (-) cable...