| Description |

Rail Pressure Sensor (RPS) Repair proceduresInspection 1. Connect the GDS on the Data Link Connector (DLC). 2. Measure the output voltage of the RPS at idle and various engine speed. ConditionOutput Voltage (V)Idle Approx...
Components 1. Front door inside handle cap2. Front door pull cap3. Front door trim4. Front door module5. Front door quadrant inner cover6. Front door lower channel7. Front door panel8. Front door belt inner weatherstrip9. Front door body outside weatherstrip10...
Desrcription The Electric WGT Control Actuator is installed on the turbocharger.It operates the vain in the Waste Gate Turbocharger (WGT) and regulates the compressed air amount by the ECM's PWM signal. This actuator consists of a DC motor which actuates the vane, a 2-step gear which increases torque of the DC motor, a position sensor which detects status of the vane, an electric control unit which drives the DC motor...