| Removal and Installation |
| 1. |
Remove the engine cover (A).
|
| 2. |
Install in the reverse order of removal. |
Inspection Throttle Position Sensor (TPS) 1. Connect the GDS on the Data Link Connector (DLC). 2. Start the engine and measure the output voltage of TPS 1 and 2 at C.T. and W.O.T. Specification: Refer to “Specification” ETC Motor 1...
C..